Skip to main content

Reply to "Dead rail LC or LC+"

First step in planning a battery powered LC+ is to measure current drain under various operating conditions to make sure that batteries can handle the drain. Following are readings taken on a Conrail Rectifier #4605 at 12.4VDC which is the nominal voltage of the battery I plan to use.  (Note: The LC+ electronics becomes active at 8.0VDC and appears to run well at 12.0VDC)

Startup prior to controller connection   80ma                                                                                                  After connection to controller               100ma                                                                                                  Bell                                                            110ma                                                                                                  Whistle                                                      135ma                                                                                                  Dispatcher                                         130-150ma                                                                                                  Low speed running                           300-350ma                                                                                                  Medium speed running                 800-1000ma                                                                                                 

These readings are a bit higher than those of my BlueRail locos, but are not enough higher to cause any real problems. Thought those of you who want to try such a project would find this data useful.     Will keep everyone updated. 

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×