Skip to main content

Reply to "Derailments?"

Trackwork and wiring, the two most important parts of the layout for smooth/reliable operation.

I've seen a few layouts with large gaps between track sections and undulating rails.

I've never had a derailment that wasn't operator error, i.e. a turnout thrown incorrectly etc.

One thing I did when building my layout was sighting down the top of the rails at eye level.

I then removed and dips and rises by either shimming or snugging down track screws.

This is especially important near turnouts.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×