Skip to main content

Reply to "Design for First Permanent Layout"

I have updated the plan utilizing your suggestions.  I added a hatch area as well to be able to reach the far right corner and the crossovers.  I also checked the clearance at the switch by the bridge tunnel. As the pictures show, it looks like clearance won't be an issue.  Even the PA-1s look ok, and they won't be running that line of tight curves.  I tried Carl's wye idea, but it didn't quite work out.

Greater Penn RR 1.1Greater Penn RR 1.1 3DSD18 ClearancePA-1 Clearance

Attachments

Images (4)
  • Greater Penn RR 1.1
  • Greater Penn RR 1.1 3D
  • SD18 Clearance
  • PA-1 Clearance
Files (1)
OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
330-757-3020

www.ogaugerr.com
×
×
×
×
×