Skip to main content

Reply to "Did you do all the work on your layout?"

I spent about 3-4 months in 2010-2011 building the benchwork, getting my mainline down and wired, doing skies on my backdrop, and building 20 plus buildings.  I was away from it for several years due to family issues.  In December, I started working on it again.  I painted the backdrop, installed the Atlas O signal system (20 signals), installed plaster wrap/sculptamold, made rock molds and installed them, installed Lionel telephone poles, made and installed speed/yard limit signs/state line signs, and installed SC2's.  

My layout is a folded dog bone.  I am currently working on long section that will have a yard.  I am detailing the mainline section along the wall and will be adding the yard track within the next couple weeks.  I hope to finish this section by 4/1.  Once completed, I will have 80% of my layout track down and wired.  

Despite building many buildings years back, I have bought several Woodland Scenic Built ups.  For $100.00 you can't beat what you get for that amount.  Their buildings are great and the minor details added are well worth the money.  I could never reproduce what they provide for that amount and I could never replace the time savings that those purchases provide.  I hope to get the entire layout essentially completed to a point where it only requires tweaking.  I am really enjoying the progress.

The problem is that I am already thinking of ways to expand the layout once I get to that tweaking stage.  Hahaha!!! 

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×