@gunrunnerjohn posted:It appears that the front of the boiler is limited in movement by the smoke unit, and the cab doesn't clear the back of the walkways. I can't see how to move it back far enough to lift the rear with the cab free.
I had to remove the engineer from his seat as he was hitting the control stand. That is what gave me the clearance needed but there there might be other ways?