Skip to main content

Reply to "Do you like Triple-Heading switchers?"

About 8-10 years ago, I was on a railfan trip with a buddy.   We spent some time in the Pittsburgh area, and went up on the George Westinghouse Bridge over Turtle Creek Valley.    From the bridge  you look down a couple hundred feet or more into valley with quite a few RR tracks and various connections. 

While up there a Union RR train come up a steep grade out of one of the steel plants with a string of flatcars with hot slabs on them - Slabs are pieces of steel about a foot thick, 4-5 feet wide, and 30-40 feet long.    These were still hot and smoking.     The Union was the US Steel owned RR that served their plants in Pittsburgh area and was also a common carrier.  

This train had about 5 SW8s or SW9s just working their hearts out coming up the grade onto the main with about a dozen of theses slab cars.     Lots of noise and exhaust.    So multiple switchers running MU is a really neat thing.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×