Skip to main content

Reply to "Do your upper and lower levels connect?"

My levels are connected. I use the lower level to run passenger and freight trains with the upper level as the Beer Line. The upper level is, in essence a switching layout where I shuttle reefers between the upper and lower levels and among the brewery buildings. The climb up is rather steep, which limits the number of reefers to four (plus a transfer caboose). The whole layout is 8 x 23 with the upper level at 8 x 16. The attached crummy picture shows the turnout leading up to the Beer Line. I treat the upper level as a separate block. I'm very happy with this configuration because it gives me the best of both worlds.

Jim

levels

Attachments

Images (1)
  • levels

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×