Skip to main content

Reply to "Double main over-under layout (update 09/13/21)"

@Mark Boyce posted:

Very smooth looking cutting and track, Keith!!

Thanks Mark

The actual track isn't following the SCARM plan. SCARM called for a cut 2.86" straight on the turnout leg. Actual 1.75". SCARM called for 1.75" at the entry to the turnout. Actual is more like 1.5". I installed a 1.25" for now. But, that's okay.  All the sub-roadbed was laid out with a 48" adjustable home made compass. So, I have numerous datum points. I just make sure the track is centered, parallel and starts and stops at the datum points. 

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×