Skip to main content

Reply to "Dunham Studios "Family Heritage Lionel Layout""

The Family Heritage Lionel Layout went by truck to the client's home where it was, over the course of three days, installed in the second floor room which would be its permanent home. The delivery photos were taken by John Doty the first day as he Mike & Tom brought the layout into the house and set it up before Tom had to return home. Clarke & I joined John & Mike the next day so I was able to (aside from helping) take the rest of the pictures you see below.  The layout looks beautiful in place and is real fun to watch (and run) as the trains and the animations all do their thing.

BarbIMG_4539IMG_4540IMG_4542IMG_4544IMG_4545IMG_4546IMG_4548IMG_4549IMG_4550IMG_4552FHL at client's with John connecting right side control shelfFHL at client's with Mike screwing down rear trackFHL at client's, Mike connecting right side control panelFHL at client's with Mike screwing down rear trackFHL at client's, Mike connecting right side control panelFHL Mike doing wiring under fight side in placeFHL at client's, front view with tracks in placeFHL Clarke rounding up train carsFHL Mike on layout top placing Lionel animations-2FHL Mike on layout top placing Lionel animations-3FHL Mike checking that an animation is working properlyFHL controls in place, trains randomly put on layout for sortingFHL Clarke assembling PRR train on trackFHL controls in place, trains randomly put on layout for sortingFHL right side with train display trackFHL left side of layout low viewFHL layout in place-front viewFHL right side of layout in placeFHL layout at clients silhouetted against window home.

Attachments

Images (25)
  • Mike & Tom unloading the truck
  • Carrying layout piece up the stairs
  • Starting assembly
  • Rear platform in place
  • Under the layout control panel in place
  • Tom & Mike assemble base frame
  • Upended platforms
  • Mike working on the platform top
  • Me touching up scenic seams
  • John connecting right side control shelf
  • Mike screwing down rear track
  • Mike connecting right side control panel
  • Mike doing wiring under right side
  • Front  view with tracks in place
  • Clarke rounding up train cars
  • Mike on layout top placing Lionel animations-2
  • Mike on layout top placing Lionel animations-3
  • Mike checking that an animation is working properly
  • Controls in place, trains randomly put on layout for sorting
  • Clarke assembling PRR train on track
  • Right side with train display track
  • Left side of layout low view
  • Layout in place-front view
  • Right side of layout in place
  • Layout silhouetted against window

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×