Skip to main content

Reply to "EMD E9 major design difference questions"

Stuart posted:
GG1 4877 posted:

The second NH order for FL9s were all delivered in 1960 with 567D prime movers.  The first 30 built in 1956 had the 567C prime movers.  I'm not sure there are any external differences other than the NH orange used between the first and second order was a different shade. 

I've heard that there was talk of designating the second group of FL9's "FL18."

Stuart

 

Nope. Never found anything in the records to substantiate that "rumor", including talking to the "old guys" in the Engineering Dept.. I knew Bob Konsbruk very well. He was also responsible for designing and assisted in building the DC substation for the electric locomotive & trolly lines at the Illinois Railway Museum.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×