Bob,
The track actually goes into the next room where I plan to build a short staging section about 8 feet long. The layout is a 3'x19' shelf switching layout. The staging will allow me to build a short consist that will enter through the "tunnel" to be switched. Once I eventually build all my industries, I will have up to 18 places to spot cars.