Skip to main content

Reply to "F&L Railroad Progress - 4/18/18 Update!"

SO now that I have a source of 054 Atlas O Switches, I've been able to get some track progress done on the layout. 80% of the track is now complete, except for the areas highlighted in red in the photo below. I have temporary straight and curved sections in were there should be switches. I'm just happy to have my reverse loops functional and have basically 2 sidings where i can park trains.

dogboneloopswithreversesmallyardandturntableall054curveswithyardleadSubRoadBedRevised2

Attachments

Images (1)
  • dogboneloopswithreversesmallyardandturntableall054curveswithyardleadSubRoadBedRevised2

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×