The red wire and the green wire or the THRU terminal and the OUT terminal control switch movement. When one of those terminals goes to GND the points are thrown the corresponding direction. Running two wires from one Fastrack track switch to another is all that is required. The non-derailing feature of either switch will trigger the other switch.
|