@Former Member posted:I love this layout. I am trying do it on a budget. Which switches do think I could remove for the time being?
Well, the industry and yard turnouts would be the first to go.
But thinking from the other direction, you could start with the two inside loops, add the outside perimeter route, and then add the crossovers and connections as $$ allow.