Skip to main content

Reply to "Finished 2-rail layouts"

Thanks for additional information, that two-rail obviously wins the beauty contest

Are you able to build super-elevation with 2-rail track or is that inviting operational challenges? I would think that the roadbed and sub-roadbed would need to be smooth laterally and longitudinally, though  transition sections could pose a problem. It is challenging with 3-rail as well but the result is well worth it, as trains lean into the curves.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×