SJC posted:Per Trains Mag, sounds like the plug was pulled on photo trips and (likely) for operation this year.
Hoping for "winter" to get it to run
I have been wondering when reality would set-in with Mr. Garner (sp), General Manager at WMSR? There is no way that 1309 would/could be "ready" in 2017, what with all the running gear work required, plus still some 200 staybolts requiring replacement.