Skip to main content

Reply to "Flues going in 1309"

SJC posted:

Per Trains Mag, sounds like the plug was pulled on photo trips and (likely) for operation this year.

Hoping for "winter" to get it to run

I have been wondering when reality would set-in with Mr. Garner (sp), General Manager at WMSR?  There is no way that 1309 would/could be "ready" in 2017, what with all the running gear work required, plus still some 200 staybolts requiring replacement.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×