Skip to main content

Reply to "Fueling rig help"

Joe I am working on some thoughts for the fueling and Sanding facilities for my new Diesel Shop. I have my Transfer table set up directly in front of the area where my shop will be placed. I have an ABBA Shop right beside this new Diesel shop and a asile on the other side. So my Fueling and Sanding will be right in front of the shop. I am leaving 24" long area for the Fueling and Sanding. I was thinking that I could do shared facilites per pair of tracks. I have 12 stalls in the shop. So was looking for ideas on what others had done for their facilities. I saw the rig above that Milwakee road Dave has and thought that it looked pretty cool.

Joe when you get back to the Sanding and fueling facility keep me posted to your thoughts. Bill

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×