Skip to main content

Reply to "Gaps in between sections of Tubular Track"

When assembling modular layouts, I accept gaps up to 1/8" before I start pushing rails to shorten the gap.  Curve modules are usually the problem as the track ends at the module edge and gets pushed in during transport handling.  I can slide the rails back into position using track pliers and a steady but firm push.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×