Hi Guys, weather ain't been great ,holdin things back but got a bit done yesterday and a few days ago.  Got armoured cabling laid and an external plug box installed for power supply to the pond. Laid this along the route of the path next to the new pond area. Also got the brick lip laid along the pond edge. Hardcore laid over the armoured cabling. Once the pond liner is in situ ,paving slabs will be laid on top of this formation.DSCN4345DSCN4350