Skip to main content

Reply to "Garden and railway complete re-hash"

Hi Guys, this mornin's progress.  Header pool now has had its final layer of waterproof cement and has been dressed with stone. Still some work to be done on the edges but that  will have to wait till the cement in the basin is cured. The big stone sticklin up on the left is actually pressing down the end of the feed-water hose into the cement till the cement cures and fixes it in position as the plastic of the hose is quite rigid and springy. DSCN5120DSCN5121 

Attachments

Images (2)
  • DSCN5120
  • DSCN5121

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×