Hi Guys, well spent a day of very mixed weather,torrential showers interspersed with very hot sunshine tryin to get the back left hand corner next to the pond done. Tricky because of the electrical boxes and pipework underneath.Some stones cemented in place others sitting loose of necessity for any required future maintenance access. More or less finished. All I have to do now on the lower section of the garden is some edging stonework next to the tracks and some ballasting and thats this side of the place pretty much ready to roll. Time for a hot shower and an early bed !!
|