Hi Guys, well quite a productive day yesterday. The left hand corner of the layout is almost complete ,now movin forward onto the back straight section and turntable area. Have to have access to the turntable pully mechanism for maintentance/ repair so have done the scenic work in such a way that I can still get at it. Took the stonework right to the edges but left a brick-wide trough. Loose bricks cover the trough then in turn will be covered by loose natural stones.
|