Hi Guys, started to get to grips with the track laying down the back of the flowerbox fence. No matter how I tried to wangle the pointwork and sidings there was no way I could get a satisfactory set up for the steam locomotive servicing area so part of the 1:1 scale footpath is being ripped out and re-hashed so I can get another road in. Bit of a nuisance but hey-ho needs must !
|