Skip to main content

Reply to "Garrett's 2021 Christmas train layout"

the backdrop is the most time-consuming element in the entire layout.  I made a piece for the middle section in the back.  also had to make some length adjustments to the other back pieces.  I am painting two coats of blue as a base sky color then will add some other hues to achieve the desired look.  the overall length is about 19'

thumbnail_IMG_9315thumbnail_IMG_9316thumbnail_IMG_9317thumbnail_IMG_9318thumbnail_IMG_9319

Attachments

Images (5)
  • thumbnail_IMG_9315
  • thumbnail_IMG_9316
  • thumbnail_IMG_9317
  • thumbnail_IMG_9318
  • thumbnail_IMG_9319

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×