Skip to main content

Reply to "Good Layout Flaw? Huh!"

One more clue to  this mystery. 

When the train runs straight through the switch, runs through the reverse loop and approaches the switch again, it slows down a lot.

When the train takes the curve through the switch, it first slows down a little, and then resumes normal speed as it runs through the reverse loop and approaches the switch again.

Arnold 

 

Last edited by Arnold D. Cribari

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×