Skip to main content

Reply to "Grade on train layout"

% grade is the rise divided by the run X 100%.  On a small layout it is difficult to get 2%, or less grades.   This is an 3.8% grade.   A 7" rise requires 15 ft. (180") of run.  Both grades pictured require the curves to also be part of the grade.  There is very little of the outer loop that is not a grade/level.  

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×