Skip to main content

Reply to "Grade on train layout"

CAPPilot posted:

It must be really nice to have a layout large enough to have 2% or less grades. I'm trying to limit mine to 3-3.5% since previous posts on this subject indicate engines with traction tires can handle that with a decent lenght train.

You can actually cheat a little bit.  Don't think of one track going up or down.  Where my train departs for an upper level, I have that track going up and the other track going down at the same time.  That way the run to get the required height is not as great.  One track goes up 4 inches and one track goes down 4 inches, now I have 8 inches of clearance for the train to go to a tunnel below the upper level.

This run is 21 feet to go from level to an 8" clearance.  But that is really only 4 inches over a 21 foot run.  Pardon the mess, I've been working on this area.

Have Fun, Ron

IMG_20180114_115047839IMG_20180114_115102862

IMG_20180114_115034711IMG_20180114_114945319

Attachments

Images (4)
  • IMG_20180114_115047839
  • IMG_20180114_115102862
  • IMG_20180114_115034711
  • IMG_20180114_114945319
Last edited by Ron045

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×