Skip to main content

Grain Loading Facility

I've been working on building my model RR for some months now and thought I'd share some progress photos from time to time. The layout is based loosely on operations at various points along the ATSF Trans-con during the mid 1990's. This is a grain loading facility I'm currently building, similar to one's found throughout Kansas and Eastern Colorado. I've only constructed about 20% of bench work thus far so I have a long way to go. Hope you enjoy.

015

001

Siding east entrance to grain facility.

IMG_2995

Trestle on mainline at silo’s east siding entrance.

8F3347E5-EAD0-4A23-9EF4-B168D8D1EF4A

5/10 - Cutting in turnout for storage track.

6C4F677C-E7A1-4494-9E2A-14574B8573FC

5/17/2019 - Next 8' module built/installed and mainline track down. Continuing to build turnout to storage track and on to west siding entrance.

004045

A56F3947-F003-4E5E-BF32-9EBA8298E482


AB1ECC8F-665F-4B38-88F8-C9ADD1BB4405

IMG_0204

Attachments

Images (10)
  • 015
  • 001
  • 6C4F677C-E7A1-4494-9E2A-14574B8573FC
  • IMG_2995
  • 004
  • 8F3347E5-EAD0-4A23-9EF4-B168D8D1EF4A
  • 045
  • AB1ECC8F-665F-4B38-88F8-C9ADD1BB4405
  • IMG_0204
  • A56F3947-F003-4E5E-BF32-9EBA8298E482
Last edited by jgtrh62
Original Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×