New LCC logic added to detect when upper interchange/staging 3-track loops are occupied.

Joe and I added logic to detect when and how many of the 3 track loops are occupied and send the info to a signal mast along the track leading to the staging yard.

The signal is SM101 with explanation in red in picture below indicating conditions.

In this case: red for all loops occupied.

signals RR-cirkits CB 78

Yellow when one loop is available for entry.  Any combination works for all conditions. 

signals RR-cirkits CB 79

Flashing yellow when two loops are available for entry.

signals RR-cirkits CB 80

Green when all 3 loops are available for entry.

signals RR-cirkits CB 81

Here's the logic.   We learned something new in that parenthesis can be used to define your logic after all the variables are defined.  In this case we needed a variable for each loop being occupied and unoccupied and then set up the logic to light the respective signal light for each condition. 

signals RR-cirkits CB 82

Logic for all 4 situations. 

signals RR-cirkits CB 83

The 'virtual' signal is set up on the monitor: I now have to set up the physical one leading into the staging loops.

signals RR-cirkits CB 84

Will be able to tap into the left side of this LCC signal board. 

We enjoyed setting this up as it was very rewarding once we got it working. 

signals RR-cirkits CB 85

Attachments

Images (8)
  • signals RR-cirkits CB 78
  • signals RR-cirkits CB 79
  • signals RR-cirkits CB 80
  • signals RR-cirkits CB 81
  • signals RR-cirkits CB 82
  • signals RR-cirkits CB 83
  • signals RR-cirkits CB 84
  • signals RR-cirkits CB 85
Last edited by samparfitt

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×