Skip to main content

Reply to "Great Northern railway"

Passenger yard expansion (cont)

Three turnouts installed along with the manual 'hand throws'.  The 3 new leads will be about 15' long which should be enough length for the 3 passenger trains in the freight yard. 

Not a whole lot done but spent some time this evening on the track.

The 25 pieces of track was shipped out today from NJ so it should arrive in about 3 days.

GNRR10523

Attachments

Images (1)
  • GNRR10523
Last edited by samparfitt

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×