Passenger yard expansion (cont)
Three turnouts installed along with the manual 'hand throws'. The 3 new leads will be about 15' long which should be enough length for the 3 passenger trains in the freight yard.
Not a whole lot done but spent some time this evening on the track.
The 25 pieces of track was shipped out today from NJ so it should arrive in about 3 days.