Train station move in Hamilton, Ohio.
Joe and I went to the location the day before the move.
There are 2 buildings and they are only moving the smaller one tomorrow.
'They' said at 9 AM.
Large 'L' brackets on all corners connected by steel cables.
The walls have support wood under the entire length of the walls.
1" thick plywood to support the window openings.
Surprised they were throwing out a lot of this nice 1" thick 'ply' in the 'dumpster'. 4' squares and larger.
The small 'connecting' building between the two buildings was 'torn down'.
Original 'center building' that I took last summer.
Interior of the larger building.
They said it would take a couple weeks to 'prep' this building for the 'move'.
Some sophisticated 'hydraulics'!
There's a couple 'side streets' that 'dead end' onto the main street that we can 'park on' tomorrow morning.