Train station move in Hamilton, Ohio.
Joe 'time lapsed' the move.
A train passed with some unusual freight cars.
Moved, probably, about a 1/4 MPH.
Remote control operator of all wheels that rotate independently plus 'hydraulics' keeps it level.
On the road.
Lots of spectators.
Only about 1000' on the pavement.
About a 1/4" thick steel plates laid on all dirt areas.
Departing from the street to the new lot.
The 'final resting place'.
The foundation of cement already 'in place'.
They stopped moving the building so we left.
Only about 2 hours 'total time'.