CB's moved to above the main control panel.

First, two green wires were soldered to J7-1,2 for the spst toggles 'normal closed' buttons that will arrive in a few days.

Both '4 sets' of CB's were moved to above the main control panel for ease of identifying which CB is shorting plus able to push the reset button (SPST) after the short is cleared.

Took about 3 hours to move and rewire the CB's.

Probably a narrow 1/4" thick piece of ply will be mounted along the left side of each bank of CB's for the spst buttons.

All eight districts were marked D-1 to D-8 on the main control panel and also the CB's.

DCC PSX circuit breaker 06DCC PSX circuit breaker 07

Except of D-8 (off to the far left), the remaining district labels are sequential and aligned with each other.

 

DCC PSX circuit breaker 08

Attachments

Images (3)
  • DCC PSX circuit breaker 06
  • DCC PSX circuit breaker 07
  • DCC PSX circuit breaker 08
Last edited by samparfitt