Skip to main content

Reply to "Great Northern railway"

Thanks, Mike.

========

PRR T-1 4-4-4-4 decoder install (cont)

Final assembly.

Test videos:

At Tye:

https://www.youtube.com/watch?...amp;feature=youtu.be        

At Tumwater canyon trestle:

 https://www.youtube.com/watch?...amp;feature=youtu.be

At Wilmar:

 https://www.youtube.com/watch?...amp;feature=youtu.be

West of St. Paul:

 https://www.youtube.com/watch?...amp;feature=youtu.be

---

Testing sound and lights.

PRR T-1 4-4-4-4 alco 27

Used 1/16" diameter heat shrink tubing to protect all the light wires from getting damaged from installing the weights, etc.   Electrical tape used to secure heat shrink tubing to boiler.

PRR T-1 4-4-4-4 alco 28PRR T-1 4-4-4-4 alco 29

Final check.

Engine was shorting.  One tire on the tender truck came loose: some thin CA fixed it.

Engine has two weights but not 'super' weighted like my engines that I did in the 80's.

This, essentially, a 4-8-4 can handle 30-35 cars up the 0.5% grade.

A good running engine; went from Seattle to the interchange with no problems.

PRR T-1 4-4-4-4 alco 30PRR T-1 4-4-4-4 alco 31PRR T-1 4-4-4-4 alco 32

Attachments

Images (6)
  • PRR T-1 4-4-4-4 alco 27
  • PRR T-1 4-4-4-4 alco 28
  • PRR T-1 4-4-4-4 alco 29
  • PRR T-1 4-4-4-4 alco 30
  • PRR T-1 4-4-4-4 alco 31
  • PRR T-1 4-4-4-4 alco 32
Last edited by samparfitt

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×