Skip to main content

Reply to "Great Northern railway"

PRR S-1 decoder install (cont)

Wiring done.

Had to use resistance soldering on a loose ash pan.

PRR S-1 6-4-4-6 gem 39

Cut LED black wires shorter than other red wires as routing wires through 1/16" thick heat shrink tubing and not enough room to also insulate the black from the red inside the 1/16" tubing.

 

PRR S-1 6-4-4-6 gem 40

10 LED's completed in boiler.

Four way connector for PM. Protective 1/16" heat shrink tubing taped to top of boiler. 

Weight re-installed.

PRR S-1 6-4-4-6 gem 41

Motor, fire box glow LED and connector to boiler complete.

PRR S-1 6-4-4-6 gem 42

Four way connector needed for PM tender shell from tender bottom.

Three LED's in the tender.

PRR S-1 6-4-4-6 gem 43

Attachments

Images (5)
  • PRR S-1 6-4-4-6 gem 39
  • PRR S-1 6-4-4-6 gem 40
  • PRR S-1 6-4-4-6 gem 41
  • PRR S-1 6-4-4-6 gem 42
  • PRR S-1 6-4-4-6 gem 43
Last edited by samparfitt