PRR S-1 decoder install (cont)
Wiring done.
Had to use resistance soldering on a loose ash pan.
Cut LED black wires shorter than other red wires as routing wires through 1/16" thick heat shrink tubing and not enough room to also insulate the black from the red inside the 1/16" tubing.
10 LED's completed in boiler.
Four way connector for PM. Protective 1/16" heat shrink tubing taped to top of boiler.
Weight re-installed.
Motor, fire box glow LED and connector to boiler complete.
Four way connector needed for PM tender shell from tender bottom.
Three LED's in the tender.