Skip to main content

Reply to "Great Northern railway"

Thanks, Mike.

==========

 

Trees:   

Finished 'decorating' the new trees.

The 'bottle brushes' are the left 3 pans.  The center two top pans are the 4" and 6" with foam added.  The center bottom two pans are 4" and 6" with 'fall' colors and the far right are the 2" which I left 'as is' as they are small and just 'fill in'.   Doesn't take long to get trees 'ready': only about 2 hours on these.  As before, I mangled the branches to remove the uniform shape on the 4" and 6" trees. 

trees 15

Work area.

trees 16

Attachments

Images (2)
  • trees 15
  • trees 16
Last edited by samparfitt

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×