Skip to main content

Reply to "Hand Laid Track and Turnouts for 3 Rail"

If anyone is interested, I completed the four 100 year old switches for a friend. I gave up on the contact arrangement in the throwbar. Got lucky with the first one, but it was troublesome to reproduce. In retrospect, was it easy? not really. The rail laying was a snap. The points and linkages were challenging. I evolved them to be fairly robust. Was it worth it? Definitely. Pics to follow.

Dave

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×