Skip to main content

Reply to "Has Anyone Tried Interchangable Scenery Modules"

Thanks for the responses.

Frank so each individual structure is on a removable base section and can be switched out.  Was the transformation of the valley done over a long period of time?  They seem more like the valley transitioned from one scene to the next rather than being changed between industries or time periods and back again on a somewhat regular basis.

Clem, when you swap time frames I understand the trains, cars and trucks, but do you do each structure individually or do you have a removable base that includes multiple structures or scenes.

BigDodgeTrains, is it 5 whole modules, bench work, table top, track, and scenery or just scenery on a tabletop?

Lou and Palallin that's kind of the idea, change the scene but in one basic move.  Yes some details will always have to be done individually but the overall scenery would be modular.

Adriatic, do you use your module strictly for access to the track underneath or are you planning to swap out the mine for another scene?

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×