Skip to main content

Reply to "Having issues with train getting power"

I appreciate the info and I apologize if the following questions sound dumb or like I’m trying to ignore the advice or take shortcuts.  

keep in mind that right now the track (I think 26 pieces) is set up on the floor of his room.  We need the ability to quickly set up or take apart the track to clean. Had hope of adding a switch or two, or crossings in the future.  The above suggestions seem like solutions if the layout is permanent correct?  

the power pack provided with the Union Pacific flyer is 36 watts and from reading other threads I see that lionel offers a 72 watt power pack. Would that be a better option if we want to continue operating on that many pieces or track, or should we downsize some?

I can’t help but feel a bit frustrated overall that lionel advertises this as a plug and play train but these solutions are bordering into the “build a layout” category. Which we simply don’t have the room to do currently.  

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×