Skip to main content

Reply to "Hellgate Bridge Restoration"

Re-assembly was a little nerve wracking.  Each bent tab created a touch-up spot.  At last the towers are complete!

Photo May 12, 9 31 20 AMPhoto May 12, 9 31 28 AMPhoto May 12, 9 31 41 AMPhoto May 12, 10 56 26 AMPhoto May 12, 10 56 50 AMPhoto May 12, 10 57 16 AM

Brass was polished.  I need more Never-Dull, that stuff is great!

Photo May 18, 10 40 28 AMPhoto May 18, 10 43 00 AM

Attaching the tricky spans:

Photo May 14, 9 28 51 PMPhoto May 14, 9 31 53 PMPhoto May 18, 10 31 59 AM

Old distributor tune-up pliers were the right size to get into the tight spots and re-bend the tabs.

Photo May 18, 10 32 26 AM

 

 Photo May 18, 11 35 52 AM

 

Attachments

Images (13)
  • Photo May 12, 9 31 20 AM
  • Photo May 12, 9 31 28 AM
  • Photo May 12, 9 31 41 AM
  • Photo May 12, 10 56 26 AM
  • Photo May 12, 10 56 50 AM
  • Photo May 12, 10 57 16 AM
  • Photo May 18, 10 40 28 AM
  • Photo May 18, 10 43 00 AM
  • Photo May 14, 9 28 51 PM
  • Photo May 14, 9 31 53 PM
  • Photo May 18, 10 31 59 AM
  • Photo May 18, 10 32 26 AM
  • Photo May 18, 11 35 52 AM
Last edited by Samplingman

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×