Skip to main content

Reply to "Iron-Bridge-Rails (The I.B.R.) (Update #8)"

So it begins! Setting some track down to map out the placement of the benchwork. I started late last night moving boxes down to the basement and placing some track where the roundhouse portion of the layout will be, approx. 82 degree on the outside loop and hand bent following its curvature on the inside loop (approx. 75/78 degree). Did this so when I get the full scale bug Ill be able to run the really big engines without any issues.

Attachments

Images (4)
  • 20220630_224730
  • 20220630_232630
  • 20220630_232619
  • 20220630_232644

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×