When you say bumbs, do you mean voltage spikes? I’m unfamiliar with the term.
Spent last night running wiring to sidings through a three position toggle. One toggle for each pair of sidings, so two toggles.
Also dug out all the buildings and accessories. I still have eight street lamps, and eight yard lights to put out, but they kept falling over, so took them off for now. Also missing a 450 track signal that is in a box somewhere.
Bought a 164 log loader today, and another 6019 track section.
This main table needs a road through there someplace. I don’t really have any plan as of now, and it looks kind of hap hazard.