Skip to main content

Reply to "High Bridge Rail Trail in Farmville, VA"

I must say that I was a little surprised that the NS was allowed to abandon the original mainline that used the High Bridge because of national security reasons. If some kind of crisis arises that needs the railroad to transport material, that stretch of track would come in handy to keep bottlenecks down.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
330-757-3020

www.ogaugerr.com
×
×
×
×
×