Skip to main content

Reply to "How can we control lighting, sound, etc"

After you develop and install the lighting system for your layout, apply for a job as City Engineer with the local electric utility. You'll be qualified!

My L-shaped layout uses the JUST PLUG lighting system for houses on my O-gauge layout, but it's modest in comparison with your emerging empire.

All the best with your mega-project,

Mike Mottler   LCCA 12394

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×