Skip to main content

How long did your layout planning stage last?

So, I have been working on my layout plan for somewhere between 1.5 and 2 years at this point.  I took down my temporary layout about 9 months ago with plans to begin renovation of the "trains room".  Due to unforeseen circumstances (i.e., letting a friend and his family stay in my house) the work on the room has been delayed a bit. However, the real purpose of my post is to ask how long each of you spent planning your layout before you began constructing?  Now I realize layouts are ever-evolving, so planning may never really end.  But I mean the initial planning stage before building benchwork, etc.  I feel like the longer I stay in the planning stage, the more unhappy I become with potential designs.  I have been in a perpetual cycle of trying to decide on an around the wall layout or taking up more space in the middle of the room.  Or trying to figure out whether a complete loop or a horseshoe style (not sure this is the right term) is better.  My train room is roughly 22 feet by 17 feet, so it has a decent amount of space.  Anyways just curious how others decided when to move out of planning and begin building and making changes to the design during the building phase?

Original Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×