I actually started planning my layout before I started construction on my house. Since I was the general contractor, I was able to make sure that the train room was exactly he way I wanted it. This allowed me to have the minimal number of obstructions, including posts, beams, pipes and ducts.

 

I did spend a fair amount of time with paper and pencil, probably about a year and a half. The plan may change a little, as was the case with the lower level, or it may totally evolve as was the case with the upper level, but I try to give everything maximum thought before any construction.

 

 

 This is one of the earliest construction photos I have taken back in 2003.

 

2014-08-29 001 2003-12-12 007

This one was taken from almost the same location late in 2014.

 

IMG_4751

 

With me, once track goes down, it STAYS DOWN! You may not want to take such a hardcore approach, but you do need to start moving forward. Carpe diem.