Skip to main content

Reply to "How long did your layout planning stage last?"

I started planning my layout back in 1980. I had an HO layout and moved so it was in boxes. The new house was a little smaller and needed some major renovations. Between family, house and work the railroad took a seat way in the back of the bus. I ended up selling the HO and started buying n-scale. My plan was to build a new house with a big basement for my trains. Finally in 1998 we started construction on the new house. I put together a temporary n-scale layout in the new basement. I was never satisfied with the bench work, so I tore everything down and started planning a new design. I started to finish off one side of the basement and had to take a break as work sent me to Afghanistan and Iraq. Back home again in 2004 I finished off the basement and had everything from that side piled in my train area. In 2009 I rediscovered O-scale and decided that's what I wanted to build. I found this site in December of 2010 and asked for design ideas. I received a few and picked one I liked that would fit my space. 17' X 28' with only one way in and no duck under.  The first thing I did was frame out the walls and put in a ceiling and lights.  I was working alone, so it took a little while.  Last October I finished installing the double track main line and completed the wiring.  I changed my yard area and I’m in the process of wiring and fastening down the track and switches.  Still a slow process.  I have about five more drops to put in and then crawl under the layout to connect all the wires to the power source.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×