Started for me some 14-15 years ago and recently ended with the installation of Ross turnouts #96 & 97. I'm a slow worker. Basic trackplan remainsthe same but a lot of additional industrial sidings and run-a-round tracks for operations. Added on to the Mianne benchwork five times as well as adding a lower level.