Dominic Mazoch posted:Is Select a Power still in use? SP had this at one time where the engineer could tell locomotives in a consist to provide traction power, or drop the unit to neutral, and have the prime mover idle. Corrections welcomed.
If I'm thinking of the same thing, yes.