Skip to main content

Reply to "How much you like switching?"

Current 2 rail layout build provides routing operation in addition to several yard functions and various industries. 

I designed everything around a main line interchange fed by a lengthy staging yard, where five branch lines go off into different directions to serve various end of line towns.  The routing operation involves scheduling RDC and Doodle bug commuter service with some mixed trains and peddler freights thrown into the mix.

I did cheat and I connected two branch lines ends for continuous running for times when I want the fish tank effect of just therapeutically running  several trains in the same direction.  That in conjunction with a long point to point (loop to loop) wrap around 3 rail eye level run provides background inspiration while working on the RR.

One troubling factor I found was that once basic running function occurred, actual work on the layout slowed drastically.

It turns into a juggling act servicing industries between passenger runs and turning steam engines at the end of each branch line.  Just need to find some fellow operators for a critique and assistance.

I bit off more than I can chew but it is a end of life challenge to finish as much as I can before the big dumpster event.

Hopefully,  I will be able to get a lot done during this shut down.  The train room has been called Tom's  crack house by well meaning friends.

Last edited by Tom Tee

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×